News news
Location nowHome > News > How to do the daily maintenance of square fountain equipment

How to do the daily maintenance of square fountain equipment

Publish Time:2020/09/02 News Number of views:9

As we all know, square fountain equipment is mainly composed of water quality, sprinklers, water pumps, underwater lights, etc. Each component has its own unique characteristics and functions. No matter which component fails, it will affect the normal operation of the fountain equipment in Hefei Square. What needs to be done for the daily maintenance of square fountain equipment

square fountain

1. Water quality guarantee for square fountain equipment?? The water quality of the square fountain equipment in Hefei shall not exceed 15 degrees, no other colors, and the turbidity shall not exceed 10 degrees, and shall not contain visible objects. The impurity content in the water is not more than 0.1%, the impurity particle size is not more than 0.2mm, the chloride ion content is not more than 400mm/L, and the pH value is within the range of 6.5-8.5. At the same time, we must pay attention to the recycling water of the fountain equipment in Hefei Square. When the nozzle is required, the circulating water should be filtered.

2. Check the water pump regularly to eliminate the fault. The problems that often occur in water pumps include no water, less indirect water or water, buzzing when the motor cannot start, low insulation resistance of the motor winding to the ground, etc. The main reasons are that the motor does not start, the pipeline is blocked, the pipeline is broken, and the filter When the network is blocked, the water is discharged from the water inlet, the electric pump is reversed, and there are foreign objects in the impeller, the cause of the fault should be found first, the fault or blockage should be eliminated, the line should be repaired or the bearing replaced, so that the pump can work normally.

3. The daily maintenance of underwater lights is also very important. Underwater colored lights are an integral part of the fountain equipment in Hefei Square, which is easily damaged. Therefore, the daily maintenance of colored lights is also very important. It is best to use heat shrinkable tubes and hot melt to waterproof the colored lights; when assembling the colored lights, ensure that the connection between the colored lights and the lamp holder is firm and not loose; when welding the lamps on the pipes, the lamps must be welded firmly to prevent the lamps from falling off. It is turned off during the process. After assembly, it should be soaked in 5% salt water for 72 hours. It can be used after the measured resistance value is qualified.

Related recommendations
Name:
Email
Message:

RSS
Follow by Email
LinkedIn
Share